Equipment Unit Permit |
Top Previous Next |
Equipment Unit Permit
Purpose: Analyze all processes that operated in a given calendar period to compare the calculated total emission level for each equipment unit to a emission permit limit for the same equipment unit.
Description: All production records are reviewed and the resulting equipment unit emission levels are calculated and compared against a permit emission value.
Additional Requirements: An Equipment Permit is needed from a list of existing permits. If a new permit is needed then it can be created from the Report Specification Window. |