Equipment Unit Permit

Top  Previous  Next

Equipment Unit Permit

 

Purpose: Analyze all processes that operated in a given calendar period to compare the calculated total emission level for each equipment unit to a emission permit limit for the same equipment unit.

 

Description: All production records are reviewed and the resulting equipment unit emission levels are calculated and compared against a permit emission value. 

 

Additional Requirements: An Equipment Permit is needed from a list of existing permits.  If a new permit is needed then it can be created from the Report Specification Window.