Equipment Unit Max Rate Permit |
Top Previous Next |
Equipment Unit Max Rate Permit
Purpose: Analyze all processes that operated in a given calendar period to calculate the maximum hourly emission rate for each equipment unit.
Description: All production records are reviewed and the resulting equipment unit emission rates are organized based on conventional classification groupings that have been designed as part of the Equipment Permit.
Additional Requirements: An Equipment Unit Max Rate Permit is needed from a list of existing Permits. If a new Equipment Unit Max Rate Permit is needed then it can be created from the Report Specification Window. |